Addressing Abandoned Public Building Projects in North-Central Nigeria: The Role of Quantity Surveyors in Project Cost Planning and Delivery Enhancing Transparency and Accountability

Authors

  • Yahaya Isah Department of Quantity Suveying, Abdulkadiri Kure University, Minna, Niger State

Keywords:

Abandoned projects, Quantity Surveyors, cost planning, public construction, transparency, accountability

Abstract

The abandonment of public building projects remains a major challenge to infrastructure development and effective utilisation of public resources in Nigeria. Abandoned projects represent wasted financial commitments, delay the provision of essential public facilities and can generate additional costs when projects are eventually revived. Evidence from Nigeria indicates that inadequate funding, poor planning, cost escalation, delayed payments, contractor-related problems and weak project monitoring are among factors associated with project abandonment. Research on public projects in Nigeria has particularly highlighted the importance of adequate planning, costing, funding and monitoring at project inception. This paper examines the role of Quantity Surveyors in addressing abandoned public building projects in North-Central Nigeria, with particular emphasis on project cost planning, financial monitoring, procurement transparency and accountability. It argues that Quantity Surveyors can contribute significantly through realistic pre-contract estimates, detailed bills of quantities, cash-flow forecasting, cost control, variation management, contractor financial assessment and transparent financial reporting. The paper recommends stronger professional involvement of Quantity Surveyors from project inception, independent cost auditing, improved procurement compliance, timely release of project funds and effective early-warning mechanisms. These measures can improve project cost certainty, transparency, accountability and ultimately reduce the incidence of abandoned public building projects in North-Central Nigeria.

 

References

[1] D. S. Adedeji, An Evaluation of the Environmental Factors That Lead to Abandonment of Public Building Projects in the Federal Capital Territory, Abuja, Master’s dissertation, Ahmadu Bello University, Zaria, Nigeria, 2016.

[2] O. F. Akinradewo, O. A. Bamidle, and D. R. Ogunsemi, “Assessment level of compliance with Public Procurement Act,” Journal of Engineering, Project, and Production Management, vol. 12, no. 2, pp. 126–136, 2022, doi: 10.32738/JEPPM-2022-0012.

[3] B. Amade, E. C. Ubani, U. F. Amaeshi, and K. A. Okorocha, “Factors for containing failure and abandonment of public sector construction projects in Nigeria,” in Proceedings of the Royal Institution of Surveyors Malaysia, 2015.

[4] C. Aigbavboa, W. Thwala, et al., “Unravelling the encumbrances in procurement management of Nigeria’s infrastructure development: Pitfalls and prospects of projects,” Property Management, vol. 41, no. 1, pp. 20–40, 2023, doi: 10.1108/PM-11-2021-0103.

[5] A. J. Babalola, A. M. Aderogba, and O. O. Adetunji, “Inflation and cost overrun in public sector construction projects in Nigeria,” ECS Transactions, vol. 107, no. 1, pp. 16137–16147, 2022, doi: 10.1149/10701.16137ecst.

[6] I. S. Damoah, A. Ayakwa, and D. K. Kumi, “Causes of government construction projects’ abandonment,” Journal of Project Management, vol. 6, pp. 179–190, 2021, doi: 10.5267/j.jpm.2021.5.004.

[7] M. M. Dlakwa and M. F. Culpin, “Reasons for overrun in public sector construction projects in Nigeria,” International Journal of Project Management, vol. 8, no. 4, pp. 237–241, 1990, doi: 10.1016/0263-3782(90)90032-7.

[8] R. E. Freeman, Strategic Management: A Stakeholder Approach. Boston, MA, USA: Pitman, 1984.

[9] J. Ibrahim, C. Loch, and K. Sengupta, “Introduction: The project abandonment problem,” in How Megaprojects Are Damaging Nigeria and How to Fix It. Cham, Switzerland: Springer, 2022, doi: 10.1007/978-3-030-96474-0.

[10] E. J. Mamman and E. R. Umesi, “Causes and effects of delay on public construction projects delivery in Nigeria,” African Scholar Journal of Built Environment & Geological Research, vol. 24, no. 4, 2022.

[11] A. Mills, “Assessment of causative factors for project abandonment in Nigerian public tertiary educational institutions,” International Journal of Building Pathology and Adaptation, vol. 35, no. 2, pp. 121–136, 2017.

[12] S. M. Mohammed and A. Idris, “Appraisal of the mitigating measures to the challenges of project cost control techniques in Nigeria,” Construction Focus, vol. 15, no. 1, pp. 83–91, 2022.

[13] C. P. Ogbu, W. E. Taigbenu, and C. F. Asuquo, “Effects of procurement documentation errors on the cost performance of construction projects in Nigeria,” NIPES Journal of Science and Technology Research, vol. 4, no. 4, 2022, doi: 10.5281/zenodo.7418201.

[14] B. S. E. Olajide, “Toward tackling the challenge of housing project abandonment through the stakeholders’ theory,” The International Journal of Humanities & Social Studies, vol. 10, no. 9, pp. 1–11, 2022, doi: 10.24940/theijhss/2022/v10/i9/HS2209-019.

[15] B. O. Simon-Eigbe, M. I. Aiminhiefe, and B. O. Bamidele, “Factors affecting project performance of building construction projects in Federal Capital Territory (FCT) Abuja, Nigeria,” Current Journal of Applied Science and Technology, vol. 41, no. 35, pp. 44–53, 2022, doi: 10.9734/cjast/2022/v41i353960.

Downloads

Published

2025-11-15

How to Cite

Yahaya Isah. (2025). Addressing Abandoned Public Building Projects in North-Central Nigeria: The Role of Quantity Surveyors in Project Cost Planning and Delivery Enhancing Transparency and Accountability. Web of Scholars : Multidimensional Research Journal, 4(6), 44–51. Retrieved from https://journals.innoscie.com/index.php/wos/article/view/406

Issue

Section

Articles